Helms Polyfoam reposted this
☎️We were recently called to tackle a high-flow leak in a wastewater treatment facility in Lakeland, TN. The 45-inch pipe leak was letting in 15 gallons per minute of groundwater, resulting in excess treatment of over 600,000 gallons monthly 🫣😧 — Not only did we stop the flow of groundwater, but we also ensured long-term protection, saving the facility valuable resources and operational costs. 💧💪 . #SuccessStory #WastewaterSolutions #EfficiencyBoost #HelmsPolyfoam #LeakSeal #LeakSolution #PipeLeakRepair #PipeRepair #InfiltrationRepair